This last part we will hook up the 2 components of a SAP BOBJ BI 4.0 environment to the SAP Solution Manager, using Managed System configuration and Technical Monitoring by assigning the products and logical components.
SAP Solution Manager Monitoring of BOBJ - Part 3 of 3 (Managed System)
Posted by Linh Nguyen on Apr 22, 2015 1:56:00 AM
Netweaver on HANA Monitoring Setup Part 2 of 3 (Managed System Configuration)
Posted by Linh Nguyen on Feb 2, 2015 5:30:00 AM
In Netweaver on HANA Monitoring Setup Part 1 of 3 (Preparation) steps were performed to allow the Solution Manager and the Managed System to communicate with each other. As a recap, the landscape consists of Solution Manager 7.1 that was previously upgraded to SPS12 including Landscape Management DB, on Windows/MSSQLServer. The systems to be managed includes SAP BW 7.31 (HNA) on HANA database SPS07 (HDB), both running on SUSE Linux 11.3.
In this Part 2, the majority of the work is to configure the managed systems with these high-level steps:
- Assign Product
- Check Prerequisites
- Maintain RFCs (for ABAP managed system)
- Assign Diagnostics Agent
- Enter System Parameters
- Enter Landscape Parameters
- Maintain Users (for monitoring ABAP managed system)
- Finalize Configuration
- Check Configuration
- Complete Configuration